This shows you the differences between two versions of the page.
Both sides previous revision
Previous revision
|
Last revision
Both sides next revision
|
devel:documentation:synchronization:dev:contract-slice-sync [2019/10/01 07:48] doischert [Fields for sync contractual relationship mapping] |
devel:documentation:synchronization:dev:contract-slice-sync [2019/12/11 12:57] svandav [HR processes proper] |
| |
==== HR processes proper ==== | ==== HR processes proper ==== |
| |
| <note important>**In new IdM installation** must **HR processes be running at least once manually or by trigger**. Without this, sync will be not able **find HR tasks** (warning will be logged in sync log)!</note> |
| |
[[devel:documentation:hr_processes|HR processes]], simply put, ensure the correct state of identity depending on the state of their contractual relationships. Because we need to evaluate the status of contractual relationships as a whole (to a given identity), it is not possible to trigger HR processes during the synchronization of each contractual relationship. Therefore, no HR processes are executed during synchronization but only after it ends. | [[devel:documentation:hr_processes|HR processes]], simply put, ensure the correct state of identity depending on the state of their contractual relationships. Because we need to evaluate the status of contractual relationships as a whole (to a given identity), it is not possible to trigger HR processes during the synchronization of each contractual relationship. Therefore, no HR processes are executed during synchronization but only after it ends. |
| |