Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
tutorial:adm:create_and_configure_trigger [2020/03/05 07:45]
tomiskar
tutorial:adm:create_and_configure_trigger [2020/03/16 12:51]
apeterova move header to the correct place
Line 47: Line 47:
  
 In the picture above, we can see another trigger and the next scheduled start is tomorrow on 31st January at 7 AM. This trigger will not disappear after that date, but will be updated to another start. In the picture above, we can see another trigger and the next scheduled start is tomorrow on 31st January at 7 AM. This trigger will not disappear after that date, but will be updated to another start.
 +
 +==== Other task trigger ====
  
 {{ :tutorial:adm:scheduled_tasks_trigger_06.png |}} {{ :tutorial:adm:scheduled_tasks_trigger_06.png |}}
  
 Now we add the trigger to the last scheduled task and in **Type** select **Other task**. In **Other task** field select another scheduled task, but as you can see on the picture above, scheduled tasks are represented by their description, because there can be more scheduled tasks with same task type. In this tutorial we selected **the second scheduled task**. Now we add the trigger to the last scheduled task and in **Type** select **Other task**. In **Other task** field select another scheduled task, but as you can see on the picture above, scheduled tasks are represented by their description, because there can be more scheduled tasks with same task type. In this tutorial we selected **the second scheduled task**.
- 
-==== Other task trigger ==== 
  
 {{ :tutorial:adm:scheduled_tasks_trigger_07.png |}} {{ :tutorial:adm:scheduled_tasks_trigger_07.png |}}
  • by apeterova