Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
tutorial:adm:czechidm_installation_finalize [2019/08/05 15:23]
apeterova provisioning of subordinates
tutorial:adm:czechidm_installation_finalize [2019/10/31 14:19]
kopro add information about password reset
Line 75: Line 75:
 idm.sec.acc.processor.identity-contract-before-save-processor.includeSubordinates=false idm.sec.acc.processor.identity-contract-before-save-processor.includeSubordinates=false
 </code> </code>
-  +  
 +==== Configure password reset for all systems including IdM ==== 
 +Please try check you project if you want reset password to all connected systems including CzechIdM after user's state will be evaluated from disable state to enabled state. This change is processed by processor **IdentitySetPasswordProcessor (acc-identity-set-password-processor)**. You can disable it by configuration property or GUI agenda of processors (it is equivalent). 
 ===== Schedule the tasks ===== ===== Schedule the tasks =====
  
Line 86: Line 89:
 If you want to use validity of the [[devel:documentation:identities#contracts|contracts]] and standard [[devel:documentation:hr_processes|HR processes]] in CzechIdM, make sure that HR processes will be started every day. There are 2 options: If you want to use validity of the [[devel:documentation:identities#contracts|contracts]] and standard [[devel:documentation:hr_processes|HR processes]] in CzechIdM, make sure that HR processes will be started every day. There are 2 options:
   * [[tutorial:adm:create_and_configure_trigger|Schedule]] the Hr...Process tasks.   * [[tutorial:adm:create_and_configure_trigger|Schedule]] the Hr...Process tasks.
-  * Ensure that [[devel:documentation:synchronization:dev:relation-sync|synchronization of contracts]] from some resource will run every day and the "After end, start the HR processes" option is ticked in the configuration of this synchronization. Also, start the 3 Hr...Processs tasks at least once **manually**, otherwise they won't be started after end of synchronization.+  * Ensure that [[devel:documentation:synchronization:dev:relation-sync|synchronization of contracts]] from some resource will run every day and the "After end, start the HR processes" option is ticked in the configuration of this synchronization. 
 +<note warning>Start the 3 Hr...Processs tasks at least once **manually**, otherwise they won't be started after end of synchronization.</note>
  
 If you want to use the [[devel:documentation:accounts:dev:protection-system|Account protection system]] for some connected system, you must schedule the [[devel:documentation:application_configuration:dev:scheduled_tasks:task-scheduler#accountprotectionexpirationtaskexecutor|AccountProtectionExpirationTaskExecutor]] to start once every day. If you want to use the [[devel:documentation:accounts:dev:protection-system|Account protection system]] for some connected system, you must schedule the [[devel:documentation:application_configuration:dev:scheduled_tasks:task-scheduler#accountprotectionexpirationtaskexecutor|AccountProtectionExpirationTaskExecutor]] to start once every day.
  
 If you want to use **Maximum password age**, schedule the tasks mentioned in [[...:czechidm_installation_finalize#password_policy|Password policy section]] to run once every day. If you want to use **Maximum password age**, schedule the tasks mentioned in [[...:czechidm_installation_finalize#password_policy|Password policy section]] to run once every day.
  • by apeterova