tutorial:adm:server_os_updates [2019/12/16 15:17]
fiserp [Performing the OS update]
tutorial:adm:server_os_updates [2019/12/17 07:35]
fiserp [Things to consider]
Line 11: Line 11:
     * IdM is often deployed as a self-service portal for users. You should plan the downtime such that minimal number of users is affected.     * IdM is often deployed as a self-service portal for users. You should plan the downtime such that minimal number of users is affected.
     * Users may make changes in the IdM that start some long running tasks (e.g. automatic roles changes). Those tasks are executed asynchronously and may be running even if the user who started the task has already logged off.     * Users may make changes in the IdM that start some long running tasks (e.g. automatic roles changes). Those tasks are executed asynchronously and may be running even if the user who started the task has already logged off.
-  * Impact on IdM batch jobs (long running tasks LRT)+  * Impact on long running tasks (LRT)
     * IdM has internal cron that schedules LRT jobs. To make things safe, no job should be running when you are doing the update. The safest way to achieve this is to stop the IdM service before applying updates.     * IdM has internal cron that schedules LRT jobs. To make things safe, no job should be running when you are doing the update. The safest way to achieve this is to stop the IdM service before applying updates.
     * LRTs run usually at night so it is not entirely necessary to stop the IdM, but you have to make sure you have enough time to perform the patching (and possible rollback) before jobs start to execute.     * LRTs run usually at night so it is not entirely necessary to stop the IdM, but you have to make sure you have enough time to perform the patching (and possible rollback) before jobs start to execute.
Line 73: Line 73:
  
 ==== Solving issues ==== ==== Solving issues ====
-During maintenance actions, it is necessary to know+For maintenance actions, it is necessary to: 
-  * How long each task will take **TT**+  * Know how long each task will take and to measure the task duration when actually performing them. 
-  * How long the whole maintenance will take **MT**. +    If tasks take longer than expected, you know if you can match the maintenance window or not
-    * This is not simply a sum od **TT**s, you should add some extra time **ET** to have a proper cushion. +  * Know how long the whole maintenance will take (maintenance time **MT**)
-  * How long (at worst) the whole rollback will take **RT**. +    * This is not simply a sum of task times, you should add some extra time (**ET**to have a proper cushion. 
-  * To have a maintenance window that spans at least **MT**+**RT** with some extra time **ET**. +  * Know how long (at worst) the whole rollback will take (rollback time **RT**)
-    * You are not able to safely perform the maintenance in shorter window - if something goes wrong, you need at most **RT** time to perform the rollback! +  * Have a maintenance window that spans at least **MT**+**RT** with some extra time **ET**. 
-    * If you do not have any **ET**, if anything goes wrong you have to perform rollback procedure. Therefore, **ET** gives you some time you can spend on solving the issue so you can continue with updates.+    * You are not able to safely perform the maintenance in shorter window, there is simply not enough time. If something goes wrong, you need at most **RT** time to perform the rollback! 
 +    * If you do not have any **ET**, if anything goes wrong you have to perform rollback procedure. Therefore, **ET** gives you some time you can spend on solving the issue so you can carry on with updates
 + 
 +You should have a rollback procedure that can safely restore the deployment. This depends on your environment. 
 + 
 +Fortunately, in most cases it simply means restoring the snapshot of the virtual machine. After restoring the snapshot, you have to perform tests (with test use-cases) to confirm the rollback was performed correctly. 
 +Minor issues can be generally resolved with the help of ``/boot`` and ``/etc`` backups you created before updating the OS. 
 + 
 +If IdM installation gets hit, you can debug the configuration or restore it from periodic backup. Since IdM is not installed from OS packages, this basically never happens.
  • by fiserp